介绍了鹿山大桥主桥的设计和计算情况,设计采用了综合的分析手段指导设计,采用空间杆系进行整体分析,同时建立三维模型进行局部分析,较为合理地解决了复杂结构的设计问题,可作其他同类桥梁设计分析参考。
介紹瞭鹿山大橋主橋的設計和計算情況,設計採用瞭綜閤的分析手段指導設計,採用空間桿繫進行整體分析,同時建立三維模型進行跼部分析,較為閤理地解決瞭複雜結構的設計問題,可作其他同類橋樑設計分析參攷。
개소료록산대교주교적설계화계산정황,설계채용료종합적분석수단지도설계,채용공간간계진행정체분석,동시건립삼유모형진행국부분석,교위합리지해결료복잡결구적설계문제,가작기타동류교량설계분석삼고。
The paper introduces the design and calculation for the main bridge of Lushan Bridge, adopts the comprehensive analyzing method to direct the design for the bridge, applies the space bar to have the general analysis, undertakes the local analysis by establishing the three-dimension model, and solves the design problems in the complicated structure in a reasonable way, so as to provide some reference for the design and analysis of similar bridges.