针对山区陡坡桥墩的复杂受力特点,根据某陡坡双桩柱式桥墩的工程实际情况,结合室内试验模型,利用ADINA有限元分析程序,分别采用顺桥水平荷载、竖向荷载、坡顶荷载和复杂荷载等不同加载方式对桩柱式桥墩进行数值分析.模拟结果表明:在顺桥水平荷载作用下或竖向荷载作用下,前后桩柱的墩顶位移不同,前桩墩的位移较后桩墩的大,且随着荷载的增加其差值也越来越大;在坡顶荷载作用下墩顶也产生竖向位移,前墩顶的竖向位移较后墩顶的大,但是随着坡顶荷载的增大其差值越来越小;在复杂荷载作用下前、后桩柱的墩顶位移较单一荷载下的相应值都要大.
針對山區陡坡橋墩的複雜受力特點,根據某陡坡雙樁柱式橋墩的工程實際情況,結閤室內試驗模型,利用ADINA有限元分析程序,分彆採用順橋水平荷載、豎嚮荷載、坡頂荷載和複雜荷載等不同加載方式對樁柱式橋墩進行數值分析.模擬結果錶明:在順橋水平荷載作用下或豎嚮荷載作用下,前後樁柱的墩頂位移不同,前樁墩的位移較後樁墩的大,且隨著荷載的增加其差值也越來越大;在坡頂荷載作用下墩頂也產生豎嚮位移,前墩頂的豎嚮位移較後墩頂的大,但是隨著坡頂荷載的增大其差值越來越小;在複雜荷載作用下前、後樁柱的墩頂位移較單一荷載下的相應值都要大.
침대산구두파교돈적복잡수력특점,근거모두파쌍장주식교돈적공정실제정황,결합실내시험모형,이용ADINA유한원분석정서,분별채용순교수평하재、수향하재、파정하재화복잡하재등불동가재방식대장주식교돈진행수치분석.모의결과표명:재순교수평하재작용하혹수향하재작용하,전후장주적돈정위이불동,전장돈적위이교후장돈적대,차수착하재적증가기차치야월래월대;재파정하재작용하돈정야산생수향위이,전돈정적수향위이교후돈정적대,단시수착파정하재적증대기차치월래월소;재복잡하재작용하전、후장주적돈정위이교단일하재하적상응치도요대.
Aiming at the complex loading characters of bridge pile at steep slope in mountains,according to a double pile-column bridge pier engineering at steep slope and test models in laboratory,finite element analyses of pile-column bridge pier were carried out under different loading,such as horizontal loading in the longitudinal direction of the bridge,vertical loading,slope top loading and complex loading,using software ADINA.The numerical simulation results show that displacements of front pile pier top and back pile pier top are different under horizontal loading in the longitudinal direction of the bridge or vertical loading,the displacements of front pile pier top are higher than those of back pile pier top respectively,and its difference is increased with the increase of loadings.Vertical displacements will also appear under slope top loading,and the displacements of front pier top are higher than those of back pier top respectively too,while its difference is reduced with the increase of loadings.Displacements of front pile pier top and back pile pier top under complex loading are larger than those under single loading.