在隧道宏观工程背景分析的基础上,对龙厦铁路象山隧道施工风险进行了详细的分析,指出了象山隧道施工面临突水突泥、地表失水、塌方、软岩变形、岩爆、瓦斯爆炸、高地温、有轨运输溜车等八项典型施工风险,对长大隧道施工风险控制具有指导意义。
在隧道宏觀工程揹景分析的基礎上,對龍廈鐵路象山隧道施工風險進行瞭詳細的分析,指齣瞭象山隧道施工麵臨突水突泥、地錶失水、塌方、軟巖變形、巖爆、瓦斯爆炸、高地溫、有軌運輸霤車等八項典型施工風險,對長大隧道施工風險控製具有指導意義。
재수도굉관공정배경분석적기출상,대룡하철로상산수도시공풍험진행료상세적분석,지출료상산수도시공면림돌수돌니、지표실수、탑방、연암변형、암폭、와사폭작、고지온、유궤운수류차등팔항전형시공풍험,대장대수도시공풍험공제구유지도의의。
Based on macro - engineering background analysis on tunnel, construction risk of Xiangshan tunnel of. Longxia railway is analyzed in detail, eight typical construction risks of Xiangshan tunnel construction like water burst and mud gushing, water loss of earth surface, landslide, deformation of soft rock, rock burst, gas explosion, high ground temperature, and rail travel car rolling are pointed out, having guiding meaning for construction risk control of Changda tunnel.