北方交通
北方交通
북방교통
NORTHERN COMMUNICATIONS
2012年
7期
6-8
,共3页
多年冻土区%路基施工%工程措施
多年凍土區%路基施工%工程措施
다년동토구%로기시공%공정조시
Permafrost%Subgrade construction%Engineering measure
以G214线第二合同段路基施工为例,对换填、片块石路基、XPS板路基、热棒-XPS板复合式路基施工技术作了重点介绍,并对上述工程措施的施工工艺、质量控制要点作了详细说明。
以G214線第二閤同段路基施工為例,對換填、片塊石路基、XPS闆路基、熱棒-XPS闆複閤式路基施工技術作瞭重點介紹,併對上述工程措施的施工工藝、質量控製要點作瞭詳細說明。
이G214선제이합동단로기시공위례,대환전、편괴석로기、XPS판로기、열봉-XPS판복합식로기시공기술작료중점개소,병대상술공정조시적시공공예、질량공제요점작료상세설명。
Taking the subgrade construction of the second construction technology exchange - filling , piece stone board combined type subgrade is introduced emphatically above engineering measures are described in detail. contract section of G214 Line as an example, the subgrade, XPS board subgrade, thermal probes- XPS and the construction process and quality control points of