山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
25期
82-83
,共2页
矿区%水文孔%溢水%冻结壁交圈%含水层
礦區%水文孔%溢水%凍結壁交圈%含水層
광구%수문공%일수%동결벽교권%함수층
mining area%hydrology drill%spilled water%intersection of freezing wall%aquifer
通过总结水文孔不溢水的原因,结合淮南矿区部分冻结井水文孔报道实例,得出淮南矿区冻结井不溢水或推迟溢水问题的主要原因,并提出了在该矿区进行水文孔设计与冻结施工的一些建议。
通過總結水文孔不溢水的原因,結閤淮南礦區部分凍結井水文孔報道實例,得齣淮南礦區凍結井不溢水或推遲溢水問題的主要原因,併提齣瞭在該礦區進行水文孔設計與凍結施工的一些建議。
통과총결수문공불일수적원인,결합회남광구부분동결정수문공보도실례,득출회남광구동결정불일수혹추지일수문제적주요원인,병제출료재해광구진행수문공설계여동결시공적일사건의。
According to the summer of the reasons for the hydrology drill without spilled water,the paper concludes the main reasons for the hydrology drill without spilled water or the delayed spilled water by combining with the reports for the hydrology drill at the freezing well in the mine areas of south of Anhui,and points out some suggestions for the design of the hydrology well and the freezing construction in the mining area.