山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
19期
185-187
,共3页
现浇梁%支架%验算%施工
現澆樑%支架%驗算%施工
현요량%지가%험산%시공
cast-in-place beam%frame%calculation%construction
根据(32+48+32)m现浇梁支架的工程概况及相关规范,进行了现浇简支梁支架验算,并对支架的施工与预压作了阐述,积累了相关经验,为今后类似现浇箱梁支架的验算与施工提供指导。
根據(32+48+32)m現澆樑支架的工程概況及相關規範,進行瞭現澆簡支樑支架驗算,併對支架的施工與預壓作瞭闡述,積纍瞭相關經驗,為今後類似現澆箱樑支架的驗算與施工提供指導。
근거(32+48+32)m현요량지가적공정개황급상관규범,진행료현요간지량지가험산,병대지가적시공여예압작료천술,적루료상관경험,위금후유사현요상량지가적험산여시공제공지도。
According to the engineering situation and related standards of (32 + 48 + 32 )m cast-in-place beam frames, this paper made checking to cast-in-place simply supported beam frames, and made eXaboration to the construction and pre-compression of the frames, accumulated related experience, provide guidance for the checking and construction of future similar cast-in-place box girder frames.