山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
20期
70-71
,共2页
基坑工程%汛期%流砂%防治措施
基坑工程%汛期%流砂%防治措施
기갱공정%신기%류사%방치조시
foundation pit project%flood season%quicksand%prevention measures
分析了汛期流砂现象的成因,结合汛期高地下水位情况,对汛期基坑施工流砂防治措施进行了探讨,并对防治措施的适用性及防治思路进行了研究,以达到控制流砂继续对基坑作业造成破坏的目的。
分析瞭汛期流砂現象的成因,結閤汛期高地下水位情況,對汛期基坑施工流砂防治措施進行瞭探討,併對防治措施的適用性及防治思路進行瞭研究,以達到控製流砂繼續對基坑作業造成破壞的目的。
분석료신기류사현상적성인,결합신기고지하수위정황,대신기기갱시공류사방치조시진행료탐토,병대방치조시적괄용성급방치사로진행료연구,이체도공제류사계속대기갱작업조성파배적목적。
The study analyzes the reasons for the quicksand during the flood season, explores the prevention measures for the quicksand at the foundation pit construction during the flood seasons by combining with the high underground water level during the flood season, and researches the adoptability of the prevention measures and'the prevention ideas, so as to control the continuing influence of the quicksand on the foundation pit construction.