溢洪道%石方开挖%施工成本%控制方法
溢洪道%石方開挖%施工成本%控製方法
일홍도%석방개알%시공성본%공제방법
spillway%rock excavation%construction cost%controlling methods
结合泽城西安水电站溢洪道石方开挖工程实际情况,针对影响该项目施工成本的工程地质,爆破区域岩性,施工工艺等主要因素,探讨了相应的成本控制方法,经实践取得了良好的经济效果,对今后同类工程具有示范作用。
結閤澤城西安水電站溢洪道石方開挖工程實際情況,針對影響該項目施工成本的工程地質,爆破區域巖性,施工工藝等主要因素,探討瞭相應的成本控製方法,經實踐取得瞭良好的經濟效果,對今後同類工程具有示範作用。
결합택성서안수전참일홍도석방개알공정실제정황,침대영향해항목시공성본적공정지질,폭파구역암성,시공공예등주요인소,탐토료상응적성본공제방법,경실천취득료량호적경제효과,대금후동류공정구유시범작용。
Combining with the factual circumstance of the rock excavation project at the Xi'an spillways in Zecheng,the paper explores the respective cost control methods by considering some main factors,including the engineering geology,the rock of the explosive regions,and the construction craft,which influence the construction costs in the program,and achieves better economic effect,so as to have the demonstration role for the similar projects in future.