通过对峡江水利枢纽二期导流模型试验与原型观测的对比分析,可以检验施工期坝址区上、下游水位一流量关系,以提高坝址区洪峰水位预报的准确性,为下一步防汛工作的度汛方案编制、优化设计提供依据.
通過對峽江水利樞紐二期導流模型試驗與原型觀測的對比分析,可以檢驗施工期壩阯區上、下遊水位一流量關繫,以提高壩阯區洪峰水位預報的準確性,為下一步防汛工作的度汛方案編製、優化設計提供依據.
통과대협강수리추뉴이기도류모형시험여원형관측적대비분석,가이검험시공기패지구상、하유수위일류량관계,이제고패지구홍봉수위예보적준학성,위하일보방신공작적도신방안편제、우화설계제공의거.
Through comparative analysis of the second stage diversion model and prototype observation of Xiajiang Hydro-junction project,we research the relation curve between water level and water flux,which helps to improve the accuracy of the flood-peak forecasting on dam area, and prepare for the next flood prevention work for the flood prevention scheme to optimize the design to provide valuable reference.