CA砂浆%封边工艺%灌注工艺%质量控制
CA砂漿%封邊工藝%灌註工藝%質量控製
CA사장%봉변공예%관주공예%질량공제
CA mortar%sealing side process%infusion processes%quality control
从材料准备工作、封边工艺、CA砂浆的拌制、转运、灌注工艺及高温下CA砂浆的质量控制措施6个方面具体介绍了CRrrsⅡ型水泥乳化沥青砂浆的施工工艺,并分别阐述了各环节的质量控制措施与注意事项.以期促进该技术在高速铁路工程中的推广与应用。
從材料準備工作、封邊工藝、CA砂漿的拌製、轉運、灌註工藝及高溫下CA砂漿的質量控製措施6箇方麵具體介紹瞭CRrrsⅡ型水泥乳化瀝青砂漿的施工工藝,併分彆闡述瞭各環節的質量控製措施與註意事項.以期促進該技術在高速鐵路工程中的推廣與應用。
종재료준비공작、봉변공예、CA사장적반제、전운、관주공예급고온하CA사장적질량공제조시6개방면구체개소료CRrrsⅡ형수니유화력청사장적시공공예,병분별천술료각배절적질량공제조시여주의사항.이기촉진해기술재고속철로공정중적추엄여응용。
The construction of the CRTS typeⅡ emulsifying asphalt cement mortar was introduced from the following six aspects of material preparation, sealing side process, the mixing of the CA cement mortar, trans- portation, pouring process and the quality control measures of CA mortar at high temperature. The quality con- trol measures and precautions for each step were elaborated so as to promote the popularization and application of this technology in high speed railway projects.