基于同步相量测量技术的广域测量系统(WAMS)为电力系统各领域的研究和开发提供了全新的数据支持平台。相量数据集中器(PDC)是WAMS中连接同步相量测量单元(PMU)和测量主站的关键环节,目前多数解决方案是采用工控机来实现。实际情况表明,基于工控机的PDC在可靠性和可扩展性方面存在明显不足。采用刀片式构架理念设计的新型PDC极大地提高了其在可靠性和可扩展性方面的表现,特别是对基于IEC 61850标准过程层总线的智能变电站有很好的适应性,实际运行验证了所提出的解决方案有效、实用。
基于同步相量測量技術的廣域測量繫統(WAMS)為電力繫統各領域的研究和開髮提供瞭全新的數據支持平檯。相量數據集中器(PDC)是WAMS中連接同步相量測量單元(PMU)和測量主站的關鍵環節,目前多數解決方案是採用工控機來實現。實際情況錶明,基于工控機的PDC在可靠性和可擴展性方麵存在明顯不足。採用刀片式構架理唸設計的新型PDC極大地提高瞭其在可靠性和可擴展性方麵的錶現,特彆是對基于IEC 61850標準過程層總線的智能變電站有很好的適應性,實際運行驗證瞭所提齣的解決方案有效、實用。
기우동보상량측량기술적엄역측량계통(WAMS)위전력계통각영역적연구화개발제공료전신적수거지지평태。상량수거집중기(PDC)시WAMS중련접동보상량측량단원(PMU)화측량주참적관건배절,목전다수해결방안시채용공공궤래실현。실제정황표명,기우공공궤적PDC재가고성화가확전성방면존재명현불족。채용도편식구가이념설계적신형PDC겁대지제고료기재가고성화가확전성방면적표현,특별시대기우IEC 61850표준과정층총선적지능변전참유흔호적괄응성,실제운행험증료소제출적해결방안유효、실용。
Wide area measurement system (WAMS) based on synchronized phasor measurement technology provides a new data support platform for research and development in all area of power system, that makes it possible to monitor and control the dynamic characteristics of gird asynehronously, and to greatly promote the research advancements of related application in power System. Data Concentrator is a key part in WAMS, which connecting synchronized phasor measurement unit (PMU) with main measuring station. Currently, most schemes for solution are implemented with industrial computer. Practices show that the industrial computer based data concentrator has apparent deficiency in reliability and scalability. The new data concentrator with blade structure design can significantly improve the performance in reliability and scalability. In particularly, the structure proposed shows strong adaptability in the application of smart substation based on the IEC 61850 process bus. Its practical operation in substation proved validity and practicality of the solution.