山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
21期
225-226
,共2页
箱梁架设%高桥墩%快速测量交接技术
箱樑架設%高橋墩%快速測量交接技術
상량가설%고교돈%쾌속측량교접기술
erection of box girder%high bridge pier%fast measurement jointing technique
结合架桥机架设客运专线预制箱梁的实际过程,根据现场施工经验,得出箱梁架设前高桥墩快速测量交接技术,提高了施工效率,降低了安全风险,增加了箱梁架设工程的经济效益,可为以后类似工程施工提供指导。’
結閤架橋機架設客運專線預製箱樑的實際過程,根據現場施工經驗,得齣箱樑架設前高橋墩快速測量交接技術,提高瞭施工效率,降低瞭安全風險,增加瞭箱樑架設工程的經濟效益,可為以後類似工程施工提供指導。’
결합가교궤가설객운전선예제상량적실제과정,근거현장시공경험,득출상량가설전고교돈쾌속측량교접기술,제고료시공효솔,강저료안전풍험,증가료상량가설공정적경제효익,가위이후유사공정시공제공지도。’
Combining with the factual process for the erection of the precast box girder along passenger special lines with the bridge machine, the study concludes the fast measurement jointing technique at high piers before the erection of box girders according to the field construction experi- ence to improve the construction efficiency, lower the safety risks, and increase the economic benefits in the box girder erection projects, so as to provide the direction for similar projects.