山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
21期
200-201
,共2页
盾构%地铁%数值模拟%施工措施
盾構%地鐵%數值模擬%施工措施
순구%지철%수치모의%시공조시
shield%subway%numerical simulation%construction measure
以西安地铁一号线某区间隧道工程为背景,通过建立FLAC数值模型,计算了盾构机旁穿天桥桩基时,桩基扰动对天桥的安全性影响,并建议了施工措施,监测结果表明,措施有效,保证了天桥的安全。
以西安地鐵一號線某區間隧道工程為揹景,通過建立FLAC數值模型,計算瞭盾構機徬穿天橋樁基時,樁基擾動對天橋的安全性影響,併建議瞭施工措施,鑑測結果錶明,措施有效,保證瞭天橋的安全。
이서안지철일호선모구간수도공정위배경,통과건립FLAC수치모형,계산료순구궤방천천교장기시,장기우동대천교적안전성영향,병건의료시공조시,감측결과표명,조시유효,보증료천교적안전。
Taking the sectional tunnel engineering of Xi' an subway line No. 1 as the background, through establishing FLAC numerical model, the paper calculates the safety impact of pile foundation perturbation upon the overpass safety while the shielding machine crosses overpass pile foundation, and puts forward construction measures. Supervision results show that the measures are effective and guarantee the safety of the over- pass.