土坝%劈裂式灌浆%质量保证
土壩%劈裂式灌漿%質量保證
토패%벽렬식관장%질량보증
Earth dam%Splitting grouting%Quality inspection
某水库主坝为均质土坝,劈裂灌浆施工前,坝体出现多条裂缝,坝坡及坝坡脚等多处渗漏水,坝土体渗透系数为6.41×10-4cm/s,坝体稳定性差。经采用劈裂灌浆施工后,其渗透系数降低至2.62×10-8cm/s,帷幕泥墙厚度及其连续性达到设计要求;坝坡及坝坡脚的渗漏水点已消除,坝体未出现新的裂缝,达到除险加固的目的。
某水庫主壩為均質土壩,劈裂灌漿施工前,壩體齣現多條裂縫,壩坡及壩坡腳等多處滲漏水,壩土體滲透繫數為6.41×10-4cm/s,壩體穩定性差。經採用劈裂灌漿施工後,其滲透繫數降低至2.62×10-8cm/s,帷幕泥牆厚度及其連續性達到設計要求;壩坡及壩坡腳的滲漏水點已消除,壩體未齣現新的裂縫,達到除險加固的目的。
모수고주패위균질토패,벽렬관장시공전,패체출현다조렬봉,패파급패파각등다처삼루수,패토체삼투계수위6.41×10-4cm/s,패체은정성차。경채용벽렬관장시공후,기삼투계수강저지2.62×10-8cm/s,유막니장후도급기련속성체도설계요구;패파급패파각적삼루수점이소제,패체미출현신적렬봉,체도제험가고적목적。
A reservoir's main dam is comprised of homogeneous earth. Before the splitting grouting to the earth dam, several cracks emerged in dam boy and water leakage was found at the dam slopes and toes with a permeability coefficient of 6.41×10-4crn/s. The dam was of poor stability. After the splitting grouting, the permeability coefficient was reduced to 2.62×10-8crn/s and the thickness and continuity of curtain wall meet the design requirements, and water leakage had been eliminated and no new cracks appeared. It achieves the ouroose of reinforcement.