北京地铁4号线宣武门站分离式双洞隧道近距离垂直下穿既有2号线地铁车站。从整体变形和单个块体位移2个角度对既有车站实测位移进行分析,得出浅埋暗挖隧道近接施工分步开挖过程中上覆地铁结构的变形规律:(1)既有地下结构整体沉降符合Peck曲线变形规律,而2个变形缝之间的块体结构位移则以转动为主,呈现刚体运动特征;(2) Peck公式拟合得到的地层损失率为0.118%~0.187%,其大小与既有地下结构是否存在、开挖断面大小无明显联系,而与新建隧道支护体系架设时机及刚度密切相关;(3)拟合得到沉降槽宽度系数为2.44~3.87,为相同埋深天然地层的1.05~1.62倍,沉降槽宽度系数与支护体系刚度无关,而与工前地层加固、既有地下结构的存在有关,且其大小与开挖面积基本呈线性关系。研究结果可为类似工程提供借鉴及参考。
北京地鐵4號線宣武門站分離式雙洞隧道近距離垂直下穿既有2號線地鐵車站。從整體變形和單箇塊體位移2箇角度對既有車站實測位移進行分析,得齣淺埋暗挖隧道近接施工分步開挖過程中上覆地鐵結構的變形規律:(1)既有地下結構整體沉降符閤Peck麯線變形規律,而2箇變形縫之間的塊體結構位移則以轉動為主,呈現剛體運動特徵;(2) Peck公式擬閤得到的地層損失率為0.118%~0.187%,其大小與既有地下結構是否存在、開挖斷麵大小無明顯聯繫,而與新建隧道支護體繫架設時機及剛度密切相關;(3)擬閤得到沉降槽寬度繫數為2.44~3.87,為相同埋深天然地層的1.05~1.62倍,沉降槽寬度繫數與支護體繫剛度無關,而與工前地層加固、既有地下結構的存在有關,且其大小與開挖麵積基本呈線性關繫。研究結果可為類似工程提供藉鑒及參攷。
북경지철4호선선무문참분리식쌍동수도근거리수직하천기유2호선지철차참。종정체변형화단개괴체위이2개각도대기유차참실측위이진행분석,득출천매암알수도근접시공분보개알과정중상복지철결구적변형규률:(1)기유지하결구정체침강부합Peck곡선변형규률,이2개변형봉지간적괴체결구위이칙이전동위주,정현강체운동특정;(2) Peck공식의합득도적지층손실솔위0.118%~0.187%,기대소여기유지하결구시부존재、개알단면대소무명현련계,이여신건수도지호체계가설시궤급강도밀절상관;(3)의합득도침강조관도계수위2.44~3.87,위상동매심천연지층적1.05~1.62배,침강조관도계수여지호체계강도무관,이여공전지층가고、기유지하결구적존재유관,차기대소여개알면적기본정선성관계。연구결과가위유사공정제공차감급삼고。
Separated two-track tunnels of Beijing Metro Line No.4 Xuanwumen station vertically cross beneath Line No.2 Xuanwumen station. Analyzing the measured displacement of the existing station structure both from the global deformation and the single structural block displacement,we obtain the deformation law of the overlying existing structure during excavation by steps. Research shows that:(1) The existing underground structure′s integral settlement complies with Peck formula,but the displacement of single block between two movement joints is rotation mainly and presents rigid body rotation. (2) The ground loss ratio fitted by Peck formula is 0.118%-0.187%. It is unrelated to the existence of the underground structure and the size of excavation section,but it is associated with the new tunnels′ supporting time and supporting stiffness. (3) The settlement trough width coefficient fitted by Peck formula is 2.44-3.87,which is the 1.05-1.62 times than the coefficient of natural stratum. It is unrelated to supporting stiffness,but it is associated with the reinforcement method,the existence of underground structure and the size of excavation section. The research result can provide reference for the similar engineering.