介绍了公伯峡面板堆石坝变形监测概况,采用实测资料详细分析大坝变形状况,结合有限元计算成果,对大坝变形性态做出评价。
介紹瞭公伯峽麵闆堆石壩變形鑑測概況,採用實測資料詳細分析大壩變形狀況,結閤有限元計算成果,對大壩變形性態做齣評價。
개소료공백협면판퇴석패변형감측개황,채용실측자료상세분석대패변형상황,결합유한원계산성과,대대패변형성태주출평개。
This paper introduced the deformation monitoring at Gongboxia concrete face rockfill dam. Based on monitoring data, dam deformation was analyzed. Combined with finite element calculation re-sult, deformation performance of the dam was assessed.