浅埋%富水%Ⅴ级%Ⅵ级全风化花岗岩隧道%施工技术
淺埋%富水%Ⅴ級%Ⅵ級全風化花崗巖隧道%施工技術
천매%부수%Ⅴ급%Ⅵ급전풍화화강암수도%시공기술
shallow buried%water-rich%V and VI completely weathered granite tunnel%construction technique
以江门隧道施工为实例,具体介绍了Ⅴ级、Ⅵ级浅埋富水全风化花岗岩隧道的施工工艺和施工方法,采用洞内降水和洞内外土体改良及加固方法。实践证明,针对隧道下穿玉龙湖泄洪道段隧道洞身超浅埋、强-弱风花岗岩软弱围岩、裂隙发育、地表水发育等特点采用的脚手架网格配合防水板铺底、水平选喷桩超前支护以及在进行水平选喷的前提下采用三台阶加临时仰拱的开挖方法等技术方案在提高隧道围岩强度、防止地表水渗流至洞内、降低地表沉降和变形方面是成功的,确保了隧道的开挖安全,顺利通过泄洪通道。针对浅埋富水软弱围岩段隧道下穿过程中围岩软弱、下穿道路过程中沉降控制严格的特点,在施工过程中从加强超前支护强度、全断面注浆等技术、保证隧道开挖安全;对隧道开挖地表段采用了旋喷桩和搅拌桩组合加固措施进行地表加固,控制隧道开挖过程中地下水的流动。通过采用以上技术措施,实现了隧道下穿过程中安全施工,保证了地面城市道路和周围建筑物的安全。
以江門隧道施工為實例,具體介紹瞭Ⅴ級、Ⅵ級淺埋富水全風化花崗巖隧道的施工工藝和施工方法,採用洞內降水和洞內外土體改良及加固方法。實踐證明,針對隧道下穿玉龍湖洩洪道段隧道洞身超淺埋、彊-弱風花崗巖軟弱圍巖、裂隙髮育、地錶水髮育等特點採用的腳手架網格配閤防水闆鋪底、水平選噴樁超前支護以及在進行水平選噴的前提下採用三檯階加臨時仰拱的開挖方法等技術方案在提高隧道圍巖彊度、防止地錶水滲流至洞內、降低地錶沉降和變形方麵是成功的,確保瞭隧道的開挖安全,順利通過洩洪通道。針對淺埋富水軟弱圍巖段隧道下穿過程中圍巖軟弱、下穿道路過程中沉降控製嚴格的特點,在施工過程中從加彊超前支護彊度、全斷麵註漿等技術、保證隧道開挖安全;對隧道開挖地錶段採用瞭鏇噴樁和攪拌樁組閤加固措施進行地錶加固,控製隧道開挖過程中地下水的流動。通過採用以上技術措施,實現瞭隧道下穿過程中安全施工,保證瞭地麵城市道路和週圍建築物的安全。
이강문수도시공위실례,구체개소료Ⅴ급、Ⅵ급천매부수전풍화화강암수도적시공공예화시공방법,채용동내강수화동내외토체개량급가고방법。실천증명,침대수도하천옥룡호설홍도단수도동신초천매、강-약풍화강암연약위암、렬극발육、지표수발육등특점채용적각수가망격배합방수판포저、수평선분장초전지호이급재진행수평선분적전제하채용삼태계가림시앙공적개알방법등기술방안재제고수도위암강도、방지지표수삼류지동내、강저지표침강화변형방면시성공적,학보료수도적개알안전,순리통과설홍통도。침대천매부수연약위암단수도하천과정중위암연약、하천도로과정중침강공제엄격적특점,재시공과정중종가강초전지호강도、전단면주장등기술、보증수도개알안전;대수도개알지표단채용료선분장화교반장조합가고조시진행지표가고,공제수도개알과정중지하수적류동。통과채용이상기술조시,실현료수도하천과정중안전시공,보증료지면성시도로화주위건축물적안전。
Taking Jiangmen tunnel construction for an example, the paper was introduced construction technology and con-struction methods of V & VI completely weathered granite tunnel, using precipitation in tunnel and improvement and strengthening methods inside and outside. Practice has proved that technical solutions of bottoming with scaffold grid and wa-terproof board, advance support of horizontal jet grouting piles and excavation method of three-step & temporary inverted arch has insured safety of excavation and successfully go through floodway aiming at shallow buried of going through Yu-long Lake spillway, soft surrounding rock of strong-wake weathered granite, growth of fissure and surface water, including improving strength of wall rock, preventing surface water transfusion in tunnel, reducing surface subsidence and deformation. Aiming at features of weak surrounding rock in process of shallow buried & water-rich section of tunnel in weak rock, and strict subsidence control, ensuring safety from strengthening strength of advance support and whole section grouting; surface section of tunnel excavation was taken reinforcement measure of jet grouting piles and mixing pile composite and control of groundwater flow in the process of tunnel excavation, which realized safety construction in the process of the tunnel excava-tion, ensured safety of city road and the surrounding buildings above ground, and also provided references for similar engi-neering construction.