省地一体化%变电站%远动定值%CIM/E
省地一體化%變電站%遠動定值%CIM/E
성지일체화%변전참%원동정치%CIM/E
provincial and district integrated%substation%tele-control system setting-list%CIM/E
针对省调、地调远动定值分别维护,数据不一致、更新不及时的问题,提出省地一体化远动定值维护方案,从省地一体化远动定值编制规范的制定和主站数据库自动生成工具的开发等方面对该方案进行分析,认为该方案可减少工作量,提高远动定值执行效率,保障自动化基础数据质量。
針對省調、地調遠動定值分彆維護,數據不一緻、更新不及時的問題,提齣省地一體化遠動定值維護方案,從省地一體化遠動定值編製規範的製定和主站數據庫自動生成工具的開髮等方麵對該方案進行分析,認為該方案可減少工作量,提高遠動定值執行效率,保障自動化基礎數據質量。
침대성조、지조원동정치분별유호,수거불일치、경신불급시적문제,제출성지일체화원동정치유호방안,종성지일체화원동정치편제규범적제정화주참수거고자동생성공구적개발등방면대해방안진행분석,인위해방안가감소공작량,제고원동정치집행효솔,보장자동화기출수거질량。
To solve the problems which are caused by the pro-vincial and district separately maintenance of tele-control system setting-list ,such as data inconsistencies and data not being updated ,this paper introduces a provincial and district integrated maintenance program of tele-control system set-ting-list .Through analysis on provincial and district integrat-ed tele-control system setting-list drawing up standard ,and the independently developed database generating tool ,this paper considers the maintenance program can reduce work-load ,improve work-efficiency ,and guarantee the quality of automation basic data .