钢结构厂房%结算审核%清单
鋼結構廠房%結算審覈%清單
강결구엄방%결산심핵%청단
steel structure workshop%settlement audit%listing
院工程结算一般是由施工单位编制,通过建设单位审核后,按照合同的相关规定来明确承发包双方的责任和义务,最终确定工程造价以及应向施工方支付的费用。本文以钢结构厂房结算审核的主要内容入手,对如何准确进行结算审核进行了思考。
院工程結算一般是由施工單位編製,通過建設單位審覈後,按照閤同的相關規定來明確承髮包雙方的責任和義務,最終確定工程造價以及應嚮施工方支付的費用。本文以鋼結構廠房結算審覈的主要內容入手,對如何準確進行結算審覈進行瞭思攷。
원공정결산일반시유시공단위편제,통과건설단위심핵후,안조합동적상관규정래명학승발포쌍방적책임화의무,최종학정공정조개이급응향시공방지부적비용。본문이강결구엄방결산심핵적주요내용입수,대여하준학진행결산심핵진행료사고。
Engineering settlement is usually prepared by construction unit, after checking by the construction unit and being in accordance with relevant provisions of the contract to clear the responsibilities and obligations, ultimately determines the project cost and the cost that should be paid to the construction side. This paper, starting from the main content of settlement and audit of the steel structure factory building, thinks about how to make the settlement audit.