盾构隧道%砂性土层%水中进洞%监控量测
盾構隧道%砂性土層%水中進洞%鑑控量測
순구수도%사성토층%수중진동%감공량측
shield tunnel%sandy soil stratum%tunneling in water%supervision and measurement
针对南京地铁10号线TA02标如何在砂性土层中保证盾构的安全推进的难点,采取冻结加固体,水中进洞,同步及二次注浆,监控量测等一些措施,较好的解决了在砂性土层中出现的流砂,渗漏,超挖等施工难题。施工应用表明,该技术实施有效地控制了地表的沉降及隆起,使盾构安全到达。
針對南京地鐵10號線TA02標如何在砂性土層中保證盾構的安全推進的難點,採取凍結加固體,水中進洞,同步及二次註漿,鑑控量測等一些措施,較好的解決瞭在砂性土層中齣現的流砂,滲漏,超挖等施工難題。施工應用錶明,該技術實施有效地控製瞭地錶的沉降及隆起,使盾構安全到達。
침대남경지철10호선TA02표여하재사성토층중보증순구적안전추진적난점,채취동결가고체,수중진동,동보급이차주장,감공량측등일사조시,교호적해결료재사성토층중출현적류사,삼루,초알등시공난제。시공응용표명,해기술실시유효지공제료지표적침강급륭기,사순구안전도체。
According to the TA02 Part of No.10 Line of Nanjing subway,the paper adopts some measures,including the frozen consolidated body,the tunneling in wate,the simultaneous and secondary grouting,and the supervision and measurement,so as to ensure the difficulties in the safety progress of the shield in the sandy stratum,solves some construction difficulties,including the flowing sand,the leaking,and the extra excavation in the sandy soil layer,and proves by the construction application that the technique can control the settlement and upheavals of the surface effectively,so the shield can be constructed safely.