综放工作面沿空开切眼跨度大、顶煤厚度大、沿空小煤柱、围岩松软、裂隙发育,支护难度大。针对宽度8 m、顶煤厚度5.6 m的综放沿空开切眼,采用理论分析、数值模拟、现场试验及监测分析等方法,研究了煤柱的留设原则、煤柱应力分布特征,优选了煤柱宽度;分析了综放沿空开切眼的支护机理,设计并试验了锚网带与锚索支护、锚网带与桁架锚索支护方案。研究结果表明,煤柱合理宽度为4~5m。2种支护方案改善了顶煤的受力状态,提高了围岩承载能力,有效控制了大跨度、厚顶煤的离层、裂隙扩展和弯曲下沉,保证了综放沿空开切眼的稳定性。
綜放工作麵沿空開切眼跨度大、頂煤厚度大、沿空小煤柱、圍巖鬆軟、裂隙髮育,支護難度大。針對寬度8 m、頂煤厚度5.6 m的綜放沿空開切眼,採用理論分析、數值模擬、現場試驗及鑑測分析等方法,研究瞭煤柱的留設原則、煤柱應力分佈特徵,優選瞭煤柱寬度;分析瞭綜放沿空開切眼的支護機理,設計併試驗瞭錨網帶與錨索支護、錨網帶與桁架錨索支護方案。研究結果錶明,煤柱閤理寬度為4~5m。2種支護方案改善瞭頂煤的受力狀態,提高瞭圍巖承載能力,有效控製瞭大跨度、厚頂煤的離層、裂隙擴展和彎麯下沉,保證瞭綜放沿空開切眼的穩定性。
종방공작면연공개절안과도대、정매후도대、연공소매주、위암송연、렬극발육,지호난도대。침대관도8 m、정매후도5.6 m적종방연공개절안,채용이론분석、수치모의、현장시험급감측분석등방법,연구료매주적류설원칙、매주응력분포특정,우선료매주관도;분석료종방연공개절안적지호궤리,설계병시험료묘망대여묘색지호、묘망대여항가묘색지호방안。연구결과표명,매주합리관도위4~5m。2충지호방안개선료정매적수력상태,제고료위암승재능력,유효공제료대과도、후정매적리층、렬극확전화만곡하침,보증료종방연공개절안적은정성。
Open-off cut along gob area of fully mechanized caving face has the characteristics of large span, large thickness of top coal, small coal pillar along gob area, soft surrounding rock and fracture development, so, its support is difficult. In this paper, in view of the open-off cut along gob area with 8 m in width, and 5.6 m in thickness, by using theoretical analysis, numerical simulation, field test and monitoring analysis, the remaining principle of coal pillars and pillar stress distribution characteristics were studied, and the coal pillar width was optimized. In addition, the support mechanism of open-off cut along gob area was analyzed, and the supporting schemes including the anchor net belt combined with anchor cable, and the anchor net belt with truss and anchor rope were designed and tested. The re-sults show that the rational width of coal pillar is around 4~5 m, and the two supporting schemes of anchor net belt combined with anchor cable and truss and anchor rope, respectively, can improve the forced state of top coal and the bearing capacity of surrounding rock, effectively control the bed separa-tion, fracture propagation, bending and subsidence of large span and thick top coal, and ensure the sta-bility of open-off cut along gob area of fully mechanized caving face.