兰州工业学院学报
蘭州工業學院學報
란주공업학원학보
Journal of Lanzhou Institute of Technology
2013年
6期
68-70
,共3页
风险源%冲桩%拔桩%隔断桩%地层加固
風險源%遲樁%拔樁%隔斷樁%地層加固
풍험원%충장%발장%격단장%지층가고
risky source%punching pile%pulling pile%partition piles%ground reinforcement
苏州地铁建设过程中遇到了不同的风险源,根据现场施工情况总结了4种针对不同风险源的处理技术,并探讨了在施工过程中的关键技术和注意事项,对以后类似工程能起到借鉴作用。
囌州地鐵建設過程中遇到瞭不同的風險源,根據現場施工情況總結瞭4種針對不同風險源的處理技術,併探討瞭在施工過程中的關鍵技術和註意事項,對以後類似工程能起到藉鑒作用。
소주지철건설과정중우도료불동적풍험원,근거현장시공정황총결료4충침대불동풍험원적처리기술,병탐토료재시공과정중적관건기술화주의사항,대이후유사공정능기도차감작용。
Different risky sources appeared in the process of Suzhou subway construction .According to the spot construction situation , four processing techniques for risky sources are summarized , and the key technique and the matters needing special attention in the construction process are presented , which provide references for simi-lar engineering constructions .