盖梁骨架%整体吊装%钢筋绑扎
蓋樑骨架%整體弔裝%鋼觔綁扎
개량골가%정체조장%강근방찰
Capping beam framework%Integral hoisting%Steel banding
通过改变传统钢筋绑扎施工工艺,采用盖梁钢筋骨架整体吊装施工工艺,可提高工作效率、保证质量,实现安全生产。
通過改變傳統鋼觔綁扎施工工藝,採用蓋樑鋼觔骨架整體弔裝施工工藝,可提高工作效率、保證質量,實現安全生產。
통과개변전통강근방찰시공공예,채용개량강근골가정체조장시공공예,가제고공작효솔、보증질량,실현안전생산。
Through changing the traditional construction technique of rebar banding, the integral hoisting construction technique of framework of steel reinforcement of capping beam is adopted for improving working efficiency and ensuring the quality to realize safe production finally.