吉林化工学院学报
吉林化工學院學報
길림화공학원학보
JOURNAL OF JILIN INSTITUTE OF CHEMICAL TECHNOLOGY
2012年
9期
36-38
,共3页
李洪涛%马付明%甄悦荣
李洪濤%馬付明%甄悅榮
리홍도%마부명%견열영
除盐水%中断%假信号%预防措施
除鹽水%中斷%假信號%預防措施
제염수%중단%가신호%예방조시
demineralized-water%interrupt%false signal%prevention measures
分析了因远传数据不准确,现场水位计卡涩,岗位人员巡检不认真,造成除盐水箱假水位,除盐水泵进空气落水,导致二期除盐水系统供应中断.
分析瞭因遠傳數據不準確,現場水位計卡澀,崗位人員巡檢不認真,造成除鹽水箱假水位,除鹽水泵進空氣落水,導緻二期除鹽水繫統供應中斷.
분석료인원전수거불준학,현장수위계잡삽,강위인원순검불인진,조성제염수상가수위,제염수빙진공기낙수,도치이기제염수계통공응중단.
The causes of remote data inaccurate and on-site water level gauge jamming, posts inspection not serious result in desalination tank leave the water level. The desalination pump into the air and the water and the second phase demineralized-water system supply disruptions were analysed.