山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
8期
248-249
,共2页
混凝土拱坝%温度应力%裂缝%控制
混凝土拱壩%溫度應力%裂縫%控製
혼응토공패%온도응력%렬봉%공제
concrete arch dam%temperature stress%cracks%control
针对小湾水电站双曲混凝土拱坝实际条件,参照相关的控制拱坝裂缝理论与实践,论述分析了在施工过程控制温度应力,从而控制拱坝裂缝的目标和具体方法,为混凝土拱坝施工过程提供指导。
針對小灣水電站雙麯混凝土拱壩實際條件,參照相關的控製拱壩裂縫理論與實踐,論述分析瞭在施工過程控製溫度應力,從而控製拱壩裂縫的目標和具體方法,為混凝土拱壩施工過程提供指導。
침대소만수전참쌍곡혼응토공패실제조건,삼조상관적공제공패렬봉이론여실천,논술분석료재시공과정공제온도응력,종이공제공패렬봉적목표화구체방법,위혼응토공패시공과정제공지도。
According to the factual conditions of hyperbolic concrete arch dam at Xiaowan hydropower plant,the paper refers to the relative cracks theories and practice for controlling arch dam cracks,analyzes the stress for controlling the temperature in the construction process,so as to control the arch dam cracks and achieve factual methods,and to provide the direction for the concrete arch dam in the construction process.