山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2012年
11期
237-238
,共2页
强夯%夯击次数%质量%控制
彊夯%夯擊次數%質量%控製
강항%항격차수%질량%공제
tamping%ramming times%quality%control
通过对中石化川东北某仓储基地强夯地基施工监理控制过程经验总结分析,提出了施工过程中质量控制、工程量统计、复核的要点和方法,对今后同类高填方地基处理施工具有一定指导意义。
通過對中石化川東北某倉儲基地彊夯地基施工鑑理控製過程經驗總結分析,提齣瞭施工過程中質量控製、工程量統計、複覈的要點和方法,對今後同類高填方地基處理施工具有一定指導意義。
통과대중석화천동북모창저기지강항지기시공감리공제과정경험총결분석,제출료시공과정중질량공제、공정량통계、복핵적요점화방법,대금후동류고전방지기처리시공구유일정지도의의。
The paper sums up and analyzes the experience for the control process for the construction supervision of the high embankment heavy tamping foundation of some storage center at Northeast Sichuan of Sinopec Sales Company,and points out the points and methods for the quality control,the quantity statistics,and rechecking in the construction process,so as to have some directive significance for some similar high filling foundation treatment in future.