tunnel%unfavorable geology%change%construction measures
针对新茨沟隧道软弱岩质片岩地段施工技术进行了研究,结合该隧道水文地质条件分析了施工难点,介绍了控制变形,侵限,水害,围岩扰动等情况的施工措施,并对施工效果作了具体阐述,为今后同类工程积累了宝贵经验。
針對新茨溝隧道軟弱巖質片巖地段施工技術進行瞭研究,結閤該隧道水文地質條件分析瞭施工難點,介紹瞭控製變形,侵限,水害,圍巖擾動等情況的施工措施,併對施工效果作瞭具體闡述,為今後同類工程積纍瞭寶貴經驗。
침대신자구수도연약암질편암지단시공기술진행료연구,결합해수도수문지질조건분석료시공난점,개소료공제변형,침한,수해,위암우동등정황적시공조시,병대시공효과작료구체천술,위금후동류공정적루료보귀경험。
The paper researches the construction technique at weak carbon-based schist section along Xincigou Tunnel,analyzes the construction difficulties by combining the hydrogeology condition of the tunnel,introduces the construction measures,including the control deformation,the clearance intrusion,the water disaster,and the disturbance of surrounding rock,and illustrates its construction effect,so as to accumulate precious experience for similar projects in future.