斜梁%两次浇筑%看台%施工顺序%支撑
斜樑%兩次澆築%看檯%施工順序%支撐
사량%량차요축%간태%시공순서%지탱
cant beam%two castings%stand%construction order%brace
结合青岛市游泳跳水馆看台的工程实践,提出了全新的看台施工方案,即看台梁板分两次浇筑,以及具体操作工艺,并重点阐述了看台板模板支设、钢筋绑扎、混凝土浇筑等关键技术,提出了保证施工方案顺利实施的诸多技术措施.
結閤青島市遊泳跳水館看檯的工程實踐,提齣瞭全新的看檯施工方案,即看檯樑闆分兩次澆築,以及具體操作工藝,併重點闡述瞭看檯闆模闆支設、鋼觔綁扎、混凝土澆築等關鍵技術,提齣瞭保證施工方案順利實施的諸多技術措施.
결합청도시유영도수관간태적공정실천,제출료전신적간태시공방안,즉간태량판분량차요축,이급구체조작공예,병중점천술료간태판모판지설、강근방찰、혼응토요축등관건기술,제출료보증시공방안순리실시적제다기술조시.
With consideration of the engineering practice of Swimming Diving Hall in Qingdao,the paper puts forward a new stand construction plan that the beam and plate will be done by two castings,and some specific operation process.It focuses on the stands beam formwork support,the reinforcement assembling set,and concrete casting.The key technology wants some technical measures that ensure the smooth implementation of the construction.