连退机组%深基坑%灌注桩%水泥土搅拌桩%止水帷幕%基坑降水
連退機組%深基坑%灌註樁%水泥土攪拌樁%止水帷幕%基坑降水
련퇴궤조%심기갱%관주장%수니토교반장%지수유막%기갱강수
continuous annealing unit%deep foundation pit%bored pile%cement-soil mixing pile%waterproof curtain%precipitation of foundation pit
以天津天铁连退机组基坑工程为背景,结合现场施工环境,基坑支护采用了灌注桩、水泥土搅拌桩、工字型钢板桩及钢支撑等相结合的支护方式,并采取了有效的降水方案,保证施工安全与质量要求,取得了很好的支护效果。
以天津天鐵連退機組基坑工程為揹景,結閤現場施工環境,基坑支護採用瞭灌註樁、水泥土攪拌樁、工字型鋼闆樁及鋼支撐等相結閤的支護方式,併採取瞭有效的降水方案,保證施工安全與質量要求,取得瞭很好的支護效果。
이천진천철련퇴궤조기갱공정위배경,결합현장시공배경,기갱지호채용료관주장、수니토교반장、공자형강판장급강지탱등상결합적지호방식,병채취료유효적강수방안,보증시공안전여질량요구,취득료흔호적지호효과。
Taking Tiantie continuous annealing unit foundation pit project in Tianjin as the background,the paper indicates the combined support way with the bored piles,the cement-soil mixing pile,rolled steel sheet piles,and the steel support by combining with the field construction environment,and adopts the effective precipitation scheme,so it can ensure the safety and quality requirements in the construction and achieve better support effect.