本文从淄博站旅客天桥吊装方案选择、吊车选择、吊具选择计算、吊装前现场达的条件、吊装现场布置、施工准备、吊装实施等方面介绍了天桥吊装实施方案,希望为以后天桥吊装提供有益的借鉴。
本文從淄博站旅客天橋弔裝方案選擇、弔車選擇、弔具選擇計算、弔裝前現場達的條件、弔裝現場佈置、施工準備、弔裝實施等方麵介紹瞭天橋弔裝實施方案,希望為以後天橋弔裝提供有益的藉鑒。
본문종치박참여객천교조장방안선택、조차선택、조구선택계산、조장전현장체적조건、조장현장포치、시공준비、조장실시등방면개소료천교조장실시방안,희망위이후천교조장제공유익적차감。
This article introduces the lifting implementation of over-bridge from the aspects of scheme choice, the crane cho-ice, selection calculation of slings, the conditions of the site b-efore lifting, the lifting scene arrangement, and construction p-reparation etc. and hope to provide some useful reference for f-uture overpass hoisting.