埋地天然气放空管线是是集输体系重要的组成部分,借助宏观检查、材质分析、金相分析和力学性能测试等手段,对发生断裂的天然气埋放空线的宏观断1:7形貌、显微组织、力学性能等进行了研究,寻找管线发生断裂的原因,为以后类似管线的生产安装提供参考。结果表明,该管线在埋地过程中,管线受到了外力作用,使管线在最大变形处产生了很大的应力,最终发生脆性断裂。这就要求我们在埋地管线施工中,除了严格检查材料本身的质量依据有关标准,施工阶段合理保障管线不受外界因素的破坏,对每一个施工环节都要保证施工质量,确保管线能承压,不堵塞,符合设计的全部要求,才不至于出现一系列安全事故和质量事故的发生。
埋地天然氣放空管線是是集輸體繫重要的組成部分,藉助宏觀檢查、材質分析、金相分析和力學性能測試等手段,對髮生斷裂的天然氣埋放空線的宏觀斷1:7形貌、顯微組織、力學性能等進行瞭研究,尋找管線髮生斷裂的原因,為以後類似管線的生產安裝提供參攷。結果錶明,該管線在埋地過程中,管線受到瞭外力作用,使管線在最大變形處產生瞭很大的應力,最終髮生脆性斷裂。這就要求我們在埋地管線施工中,除瞭嚴格檢查材料本身的質量依據有關標準,施工階段閤理保障管線不受外界因素的破壞,對每一箇施工環節都要保證施工質量,確保管線能承壓,不堵塞,符閤設計的全部要求,纔不至于齣現一繫列安全事故和質量事故的髮生。
매지천연기방공관선시시집수체계중요적조성부분,차조굉관검사、재질분석、금상분석화역학성능측시등수단,대발생단렬적천연기매방공선적굉관단1:7형모、현미조직、역학성능등진행료연구,심조관선발생단렬적원인,위이후유사관선적생산안장제공삼고。결과표명,해관선재매지과정중,관선수도료외력작용,사관선재최대변형처산생료흔대적응력,최종발생취성단렬。저취요구아문재매지관선시공중,제료엄격검사재료본신적질량의거유관표준,시공계단합리보장관선불수외계인소적파배,대매일개시공배절도요보증시공질량,학보관선능승압,불도새,부합설계적전부요구,재불지우출현일계렬안전사고화질량사고적발생。
Buried natural gas vent line is an important part of gathering pipeline system. With the help of macro examination, material testing, metallographic analysis and mechanical performance testing, the fracture morphology, the microstructure and mechanical properties, ere are studied and cause of fracture of fractured buried NG vent lines are found out, which provides a good reference for the safe operation of similar pipelines. The results show that, in burying the pipeline, a great stress was produced at the highly deformed section of the pipeline due to the external force, resulting in brittle fracture. Therefore, in the construction of buried pipelines, the pipelines should be properly protected from the damages of external factors in addition to the strict inspection of pipeline quality in accordance with applicable standards before the construction. The pipeline should be protected from external damages. The construction quality must be controlled in each construction stage to guarantee that the pipeline can sustain the required pressure, there is no plugging and design requirements are met. These will make it possible that there will be no occurrence of safety and quality - related accidents.