工程%设备%质量
工程%設備%質量
공정%설비%질량
Project%Equipment%Quality
主要介绍了黄骅港煤三期工程的规模和设计理念,重点通过工程设备详细的几个阶段进行把握和控制好设备质量关口,为将来生产运营做好设备保障工作。
主要介紹瞭黃驊港煤三期工程的規模和設計理唸,重點通過工程設備詳細的幾箇階段進行把握和控製好設備質量關口,為將來生產運營做好設備保障工作。
주요개소료황화항매삼기공정적규모화설계이념,중점통과공정설비상세적궤개계단진행파악화공제호설비질량관구,위장래생산운영주호설비보장공작。
This paper mainly introduces the scope and design philosophy of the third stage project for mining in Huanghua Harbour. And it also emphasizes on how to handle and control the equipment quality through several stages of engineering equipment in particular, which can set good stage for equipment guarantee in further manufacturing.