价值工程
價值工程
개치공정
VALUE ENGINEERING
2013年
19期
112-113
,共2页
猴车保运行%特殊支护段整修%延长猴车寿命
猴車保運行%特殊支護段整脩%延長猴車壽命
후차보운행%특수지호단정수%연장후차수명
insurance operation of mine ropeway%the roadway renovation in special supporting section%extend the life of the mine ropeway
鹤煤二矿井下地质条件复杂,井下普遍压力较大、巷道变形严重,如不及时采取措施,二部猴车随时面临停运、瘫痪的可能。通过该方案的实施,整修期间没有出现任何工伤事故,而且巷道整体面貌焕然一新,为今后特殊支护段巷道整修积累了宝贵经验。
鶴煤二礦井下地質條件複雜,井下普遍壓力較大、巷道變形嚴重,如不及時採取措施,二部猴車隨時麵臨停運、癱瘓的可能。通過該方案的實施,整脩期間沒有齣現任何工傷事故,而且巷道整體麵貌煥然一新,為今後特殊支護段巷道整脩積纍瞭寶貴經驗。
학매이광정하지질조건복잡,정하보편압력교대、항도변형엄중,여불급시채취조시,이부후차수시면림정운、탄탄적가능。통과해방안적실시,정수기간몰유출현임하공상사고,이차항도정체면모환연일신,위금후특수지호단항도정수적루료보귀경험。
The geological condition in the mine of hebi coal company No.2 mine is complicated, the pressure is generally great, and the roadway deformation is serious. If we do not take measures timely, the two mine ropeways may be off-stream and paralyzed at any time. Through the implementation of the scheme, there is no industrial injury accident during renovation period, and the overall appearance has a bright, new look. It accumulates valuable experience for roadway renovation in special supporting section.