园林工程项目%进度管理%动态控制
園林工程項目%進度管理%動態控製
완림공정항목%진도관리%동태공제
landscape engineering project%construction schedule management%dynamic control
分析园林工程施工特点,总结施工进度影响因素,提出园林工程施工进度管理目标和内容,指出为保证施工进度管理目标顺利实现,必须做好事前计划、事中控制、事后补救,采取有效的进度管理方法。
分析園林工程施工特點,總結施工進度影響因素,提齣園林工程施工進度管理目標和內容,指齣為保證施工進度管理目標順利實現,必鬚做好事前計劃、事中控製、事後補救,採取有效的進度管理方法。
분석완림공정시공특점,총결시공진도영향인소,제출완림공정시공진도관리목표화내용,지출위보증시공진도관리목표순리실현,필수주호사전계화、사중공제、사후보구,채취유효적진도관리방법。
This paper analysed the construction characteristics of landscape engineering ,construction progress influencing factors were summarized.Target and content of construction schedule management were proposed.In order to ensure the realization of construction schedule management goals , schedule plan must be made beforehand and controlled during the matter and help after the mat -ter.Relevant schedule management method should be taken.