对北京地铁6号线浅埋暗挖法车站施工引起的地表沉降规律进行研究,通过其中10个车站的地表沉降监测数据,分析地表沉降与车站埋深、开挖面积等影响因素的相关关系。研究结果表明:车站埋深与地表沉降不成反比;开挖面积相近时,东四站及其以东的暗挖车站地表沉降值明显大于其以西的暗挖车站;地表沉降区间频率曲线服从正态分布,地表沉降-40~-60 mm 出现的频率最大;暗挖车站主体小导洞及桩柱体系、初支扣拱、二衬扣拱3个主要施工阶段引起的地表沉降比值为38∶14∶5;沉降槽反弯点与隧道中线的距离为10~14 m,地层损失率为0.3%~0.7%。研究结论可为类似车站周边环境风险评估及北京规划远期地铁线路起到指导作用。
對北京地鐵6號線淺埋暗挖法車站施工引起的地錶沉降規律進行研究,通過其中10箇車站的地錶沉降鑑測數據,分析地錶沉降與車站埋深、開挖麵積等影響因素的相關關繫。研究結果錶明:車站埋深與地錶沉降不成反比;開挖麵積相近時,東四站及其以東的暗挖車站地錶沉降值明顯大于其以西的暗挖車站;地錶沉降區間頻率麯線服從正態分佈,地錶沉降-40~-60 mm 齣現的頻率最大;暗挖車站主體小導洞及樁柱體繫、初支釦拱、二襯釦拱3箇主要施工階段引起的地錶沉降比值為38∶14∶5;沉降槽反彎點與隧道中線的距離為10~14 m,地層損失率為0.3%~0.7%。研究結論可為類似車站週邊環境風險評估及北京規劃遠期地鐵線路起到指導作用。
대북경지철6호선천매암알법차참시공인기적지표침강규률진행연구,통과기중10개차참적지표침강감측수거,분석지표침강여차참매심、개알면적등영향인소적상관관계。연구결과표명:차참매심여지표침강불성반비;개알면적상근시,동사참급기이동적암알차참지표침강치명현대우기이서적암알차참;지표침강구간빈솔곡선복종정태분포,지표침강-40~-60 mm 출현적빈솔최대;암알차참주체소도동급장주체계、초지구공、이츤구공3개주요시공계단인기적지표침강비치위38∶14∶5;침강조반만점여수도중선적거리위10~14 m,지층손실솔위0.3%~0.7%。연구결론가위유사차참주변배경풍험평고급북경규화원기지철선로기도지도작용。
This paper studied the ground surface settlement law caused by Beijing metro line 6 stations construction with shallow depth subsurface excavation method and analyzed the correlationship between the ground surface settlement and its influencing factors such as station buried depth and excavation area through gathering the surface settlement monitoring data of ten metro stations. The results shows that the station buried depth is not inversely proportional to the surface settlement;the ground surface settlement value of subsurface excavation station to the east of the Dongsi station( including) is larger than the one to the west of the Dongsi station when the excavation areas are similar; the surface settlement interval frequency curve obeys the normal distribution and the most frequently occurred values of the ground surface settlement are in 40 ~60 mm; the ratio of the surface settlement caused by the three major construction stage of subsurface excavation station including subject heading,initial supporting arch and second lining arch is 38∶14∶5;the distance between the contraflexure point of the settling tank and the midline of the tunnel is 10 ~14 meters and the ground loss ratio is about 0. 3% ~0. 7%. The results provide a reference for risk assessment of the metro stations with similar environmental conditions and for long term planning of Beijing metro line.