抽水蓄能电站%竖井%监控%安全
抽水蓄能電站%豎井%鑑控%安全
추수축능전참%수정%감공%안전
pumped-storage power stations%shaft%monitoring%safety
洪屏抽水蓄能电站排烟竖井垂直总长度为231?31m,针对超长竖井开挖施工中如何加强安全控制进行了研究与探讨,施工中采取坐标控制、精确计算、支护控制、合理选用提升设备,垂直起降限位控制、实时监控,确保了人员、材料和设备在井内作业过程中的安全。
洪屏抽水蓄能電站排煙豎井垂直總長度為231?31m,針對超長豎井開挖施工中如何加彊安全控製進行瞭研究與探討,施工中採取坐標控製、精確計算、支護控製、閤理選用提升設備,垂直起降限位控製、實時鑑控,確保瞭人員、材料和設備在井內作業過程中的安全。
홍병추수축능전참배연수정수직총장도위231?31m,침대초장수정개알시공중여하가강안전공제진행료연구여탐토,시공중채취좌표공제、정학계산、지호공제、합리선용제승설비,수직기강한위공제、실시감공,학보료인원、재료화설비재정내작업과정중적안전。
The vertical total length of smoke discharge shaft in Hongping Pumped-storage Power Station is 231?31m,the excavation of super-long shaft is researched and discussed about how to improve the construction safe. A series of measures including the coordinate control, accurate calculation, support control,the lifting equipment choice, vertical limitation control and real-time monitoring are applied to ensure the safe of workers,materials and equipment in the shaft construction.