有源配电网发生故障后,综合利用备用联络线路与内部DG的孤岛运行能力为故障后的停电负荷综合恢复供电,可有效提高配电网的供电可靠性。针对此综合优化问题,提出了DG孤岛运行静态稳定裕度水平的概念,建立了有源配电网恢复供电的多目标数学模型,并通过将备用联络线路等值为DG的方式,有效简化了综合优化问题的复杂性。鉴于配电网的分布式结构及供电恢复决策的多阶段性,基于多代理技术构建了由协调层、决策层和设备层构成的多层分布式智能决策系统,并充分考虑了DG的类型及控制方式,基于孤岛的主从控制模式对恢复供电方案进行了优化计算。最后对包含3条馈线、7台DG的有源配电网的恢复供电进行了仿真计算,仿真结果表明所提模型与算法能够充分利用备用线路和各种DG资源,恢复方案切实可行。
有源配電網髮生故障後,綜閤利用備用聯絡線路與內部DG的孤島運行能力為故障後的停電負荷綜閤恢複供電,可有效提高配電網的供電可靠性。針對此綜閤優化問題,提齣瞭DG孤島運行靜態穩定裕度水平的概唸,建立瞭有源配電網恢複供電的多目標數學模型,併通過將備用聯絡線路等值為DG的方式,有效簡化瞭綜閤優化問題的複雜性。鑒于配電網的分佈式結構及供電恢複決策的多階段性,基于多代理技術構建瞭由協調層、決策層和設備層構成的多層分佈式智能決策繫統,併充分攷慮瞭DG的類型及控製方式,基于孤島的主從控製模式對恢複供電方案進行瞭優化計算。最後對包含3條饋線、7檯DG的有源配電網的恢複供電進行瞭倣真計算,倣真結果錶明所提模型與算法能夠充分利用備用線路和各種DG資源,恢複方案切實可行。
유원배전망발생고장후,종합이용비용련락선로여내부DG적고도운행능력위고장후적정전부하종합회복공전,가유효제고배전망적공전가고성。침대차종합우화문제,제출료DG고도운행정태은정유도수평적개념,건립료유원배전망회복공전적다목표수학모형,병통과장비용련락선로등치위DG적방식,유효간화료종합우화문제적복잡성。감우배전망적분포식결구급공전회복결책적다계단성,기우다대리기술구건료유협조층、결책층화설비층구성적다층분포식지능결책계통,병충분고필료DG적류형급공제방식,기우고도적주종공제모식대회복공전방안진행료우화계산。최후대포함3조궤선、7태DG적유원배전망적회복공전진행료방진계산,방진결과표명소제모형여산법능구충분이용비용선로화각충DG자원,회복방안절실가행。
After the fault in active distribution network, the service restoration based on synthetic utilization of stand-by tie lines and islanded operation ability of distributed generation (DG) inside the distribution network for post-fault load being endured power supply interruption can improve power supply reliability of distribution network. For this kind of comprehensive optimization problem a concept of static stability margin of DG being operated in islanded mode is given and a multi-objective model for service restoration of active distribution network is established, and through the equivalence of stand-by tie lines to DG the complexity of comprehensive optimization is effectively simplified. In view of the distributed structure of distribution network and multi-stage feature in the decision-making of service restoration, based on multi-agent technology a multi-layer distributed intelligent decision-making system composed of coordination layer, decision layer and equipment layer is constructed, in which the types of DG and control modes for them are fully taken into account, and base on the master-slave control mode for islanded operation the optimization calculation of service restoration scheme is carried out. The simulation of a service restoration scheme for a certain active distribution network composed of three feeders and seven DG is performed, and simulation results show that by use of the proposed algorithm and model the stand-by lines and various resources of DG can be fully utilized and the service restoration scheme is feasible.