机床与液压
機床與液壓
궤상여액압
MACHINE TOOL & HYDRAULICS
2014年
10期
101-103
,共3页
方桂花%胡娟%王兴春%李晓燕
方桂花%鬍娟%王興春%李曉燕
방계화%호연%왕흥춘%리효연
路面液压发电%蓄能器%容积
路麵液壓髮電%蓄能器%容積
로면액압발전%축능기%용적
Pavement hydraulic power generation%Accumulator%Volume
通过分析路面液压发电系统和蓄能器的工作原理及其工作状况,得知现有的蓄能器容积计算公式不适用于路面液压发电系统。在充分考虑了系统的实际工况后,经过分析推导出了符合实际应用的蓄能器容积计算方法。
通過分析路麵液壓髮電繫統和蓄能器的工作原理及其工作狀況,得知現有的蓄能器容積計算公式不適用于路麵液壓髮電繫統。在充分攷慮瞭繫統的實際工況後,經過分析推導齣瞭符閤實際應用的蓄能器容積計算方法。
통과분석로면액압발전계통화축능기적공작원리급기공작상황,득지현유적축능기용적계산공식불괄용우로면액압발전계통。재충분고필료계통적실제공황후,경과분석추도출료부합실제응용적축능기용적계산방법。
By analyzing the working principle and working conditions of the accumulator and pavement hydraulic power generation system,it was learned that the existed accumulator volume formula was not suitable for the pavement hydraulic power generation sys-tem. Taking full account of the system actual conditions,through analysis and deduced,accumulator volume calculation method cor-responding practical application was obtained.