安徽理工大学学报(自然科学版)
安徽理工大學學報(自然科學版)
안휘리공대학학보(자연과학판)
JOURNAL OF ANHUI UNIVERSITY OF SCIENCE AND TECHNOLOGY(NATURAL SCIENCE)
2014年
2期
55-59
,共5页
赵俊峰%刘满才%程志忠%谢焰
趙俊峰%劉滿纔%程誌忠%謝燄
조준봉%류만재%정지충%사염
浅水湖泊%煤田钻探%泥浆污染%平台设计
淺水湖泊%煤田鑽探%泥漿汙染%平檯設計
천수호박%매전찬탐%니장오염%평태설계
shallow lake%coal field drilling%mud contaminating%platform design
为了进行浅水湖泊水上煤田地质勘探,研究了相应的水上钻探技术。进行了泥浆污染性试验,测试了泥浆污染指标。施工中采用了封闭的泥浆循环系统,避免了泥浆对湖水的污染;基于勘探区新生界厚度大、地质构造复杂且湖区水位变化大的特点,采用新地层全程下放套管的方案,以保证井下采煤安全;通过探测湖水水位和湖底工程地质条件,进行船舶设计和航道设计,并选择合理的航道疏浚措施;针对因受交通条件限制、工作船不能运抵勘探区的问题,进行现场造船;从沉塔承载力及抗倾覆稳定性二个方面进行水上钻井平台设计。采用以上技术在淮南港河勘探区顺利完成了12个钻孔的施工,工期提前10个月。
為瞭進行淺水湖泊水上煤田地質勘探,研究瞭相應的水上鑽探技術。進行瞭泥漿汙染性試驗,測試瞭泥漿汙染指標。施工中採用瞭封閉的泥漿循環繫統,避免瞭泥漿對湖水的汙染;基于勘探區新生界厚度大、地質構造複雜且湖區水位變化大的特點,採用新地層全程下放套管的方案,以保證井下採煤安全;通過探測湖水水位和湖底工程地質條件,進行船舶設計和航道設計,併選擇閤理的航道疏浚措施;針對因受交通條件限製、工作船不能運牴勘探區的問題,進行現場造船;從沉塔承載力及抗傾覆穩定性二箇方麵進行水上鑽井平檯設計。採用以上技術在淮南港河勘探區順利完成瞭12箇鑽孔的施工,工期提前10箇月。
위료진행천수호박수상매전지질감탐,연구료상응적수상찬탐기술。진행료니장오염성시험,측시료니장오염지표。시공중채용료봉폐적니장순배계통,피면료니장대호수적오염;기우감탐구신생계후도대、지질구조복잡차호구수위변화대적특점,채용신지층전정하방투관적방안,이보증정하채매안전;통과탐측호수수위화호저공정지질조건,진행선박설계화항도설계,병선택합리적항도소준조시;침대인수교통조건한제、공작선불능운저감탐구적문제,진행현장조선;종침탑승재력급항경복은정성이개방면진행수상찬정평태설계。채용이상기술재회남항하감탐구순리완성료12개찬공적시공,공기제전10개월。
In order to explore coal field in shallow lake , the drilling technology above water was developed .The test of drilling mud contaminating to water was made .Based on the result of the test , drilling mud was kept tight-ly sealed to avoid lake water being polluted by mud .Considering the exploration area with thick new formation , complicated structure and sharp levels varying , the casing was set through the whole new formation .Ships, wa-terways and its dredging measures were designed according the surveying results of the lake levels and engineer -ing geological conditions .Ships were produced at the spot to solve the problem that the ships can not be transpor -ted there from the shipyard because of the restrictions on the traffic conditions .Drilling platforms above water were designed according to the sinking tower capability and anti -overturning check .Having adopted these tech-niques , 12 boreholes were completed at Ganghe Lake in Huainan , duration advanced 10 months .