水电与新能源
水電與新能源
수전여신능원
HYDROPOWER AND NEW ENERGY
2014年
5期
22-25
,共4页
李鹏%李修磊%黄永金%陈崇德
李鵬%李脩磊%黃永金%陳崇德
리붕%리수뢰%황영금%진숭덕
海子湖%围堰%引江济汉%粉喷桩试验
海子湖%圍堰%引江濟漢%粉噴樁試驗
해자호%위언%인강제한%분분장시험
Haizi Lake%cofferdam%water diversion works from the Yangtze river to the Hanjiang river%powder spra-ying pile test
海子湖围堰进行了粉喷桩工艺试验,介绍试验方案、质量控制措施、动力触探法、钻孔取芯和开挖检查等方法,对试验结果进行检测。根据试验检测结果确定了粉喷桩施工工艺及各项技术参数。
海子湖圍堰進行瞭粉噴樁工藝試驗,介紹試驗方案、質量控製措施、動力觸探法、鑽孔取芯和開挖檢查等方法,對試驗結果進行檢測。根據試驗檢測結果確定瞭粉噴樁施工工藝及各項技術參數。
해자호위언진행료분분장공예시험,개소시험방안、질량공제조시、동력촉탐법、찬공취심화개알검사등방법,대시험결과진행검측。근거시험검측결과학정료분분장시공공예급각항기술삼수。
An experimental study on the construction technology of powder spraying pile was carried out in the cofferdam of Haizi Lake .The experiment scheme , quality control measures , dynamic penetration method , core drilling and exca-vation inspection methods are introduced .According to results of the experimental tests , construction technology and technical parameters that should be adopted are determined .