随着电力系统规模的不断扩大,以及交直流系统混联的加强,部分母线单相短路电流大于三相短路电流的现象时有发生,给设备选择带来困难。金沙江一期工程的溪洛渡左、向家坝电站电力通过两个±800 kV直流通道送往华东地区。由于电站汇集区域大机组多、换流变电容量大,并且换流站与周边500 kV电网电气联系紧密,造成换流站500 kV侧单相短路电流大于三相短路电流,且已接近或超过现有设备所能承受的最大遮断容量,需采取措施进行限制,以保证电网的安全运行。变压器中性点小电抗接地和调整系统运行方式是限制单相短路电流的有效措施。以金沙江一期工程为背景,经过详细的模拟计算,对比了两种方式限制短路电流的效果,并提出本工程可行的降低换流站500 kV侧单相短路电流的措施。
隨著電力繫統規模的不斷擴大,以及交直流繫統混聯的加彊,部分母線單相短路電流大于三相短路電流的現象時有髮生,給設備選擇帶來睏難。金沙江一期工程的溪洛渡左、嚮傢壩電站電力通過兩箇±800 kV直流通道送往華東地區。由于電站彙集區域大機組多、換流變電容量大,併且換流站與週邊500 kV電網電氣聯繫緊密,造成換流站500 kV側單相短路電流大于三相短路電流,且已接近或超過現有設備所能承受的最大遮斷容量,需採取措施進行限製,以保證電網的安全運行。變壓器中性點小電抗接地和調整繫統運行方式是限製單相短路電流的有效措施。以金沙江一期工程為揹景,經過詳細的模擬計算,對比瞭兩種方式限製短路電流的效果,併提齣本工程可行的降低換流站500 kV側單相短路電流的措施。
수착전력계통규모적불단확대,이급교직류계통혼련적가강,부분모선단상단로전류대우삼상단로전류적현상시유발생,급설비선택대래곤난。금사강일기공정적계락도좌、향가패전참전력통과량개±800 kV직류통도송왕화동지구。유우전참회집구역대궤조다、환류변전용량대,병차환류참여주변500 kV전망전기련계긴밀,조성환류참500 kV측단상단로전류대우삼상단로전류,차이접근혹초과현유설비소능승수적최대차단용량,수채취조시진행한제,이보증전망적안전운행。변압기중성점소전항접지화조정계통운행방식시한제단상단로전류적유효조시。이금사강일기공정위배경,경과상세적모의계산,대비료량충방식한제단로전류적효과,병제출본공정가행적강저환류참500 kV측단상단로전류적조시。
@@@@With the extension of power system and the enhancement of AC -DC system, the phenomena that the single -phase short-circuit current at some buses is larger than the three -phase short -circuit current will often occur, which makes the troubles in the device selection.The power from Xiluodu and Xiangjiaba hydroelectric power stations (the first-stage project of Jinsha River) is transported to eastern region of China by two ±800kV direct current channels.As the great number of large generating units in the hydropower collecting region , the high-capacity of convertor stations , and the close link of con-vertor stations with 500 kV grid around, the single-phase short-circuit current may be larger than the three -phase short-circuit current at 500 kV buses of convertor stations , even approaching or exceeding the maximum breaking capacity of the de -vices, which must be restricted by taking some measures to ensure the safe operation of power grid .The neutral point earthed via small reactance of transformer and adjusting the operation mode of power system are the effective measures to reduce the single-phase short-circuit current.According to the first-stage project of Jinsha River, a feasible measure of reducing the single-phase short-circuit current at 500 kV buses in convertor stations is presented through the detailed simulation calcula-tion and the comparison between two different measures of restricting the short -circuit current.