大型渡槽槽身设计挠度要求较高,要求对其支撑系统进行预压,测出排架、地基沉降变形,为支撑系统施工设置预拱值提供依据。因渡槽自身荷载大,而且支撑系统预压最大加载是其自身荷载的1.2倍,为保障施工安全和进度,采用半跨和分配梁承重结构预压方式。首先计算出半跨槽身整体荷载(活荷载和恒荷载),然后根据分配梁承重结构形式和三级预压方式,将荷载分解到分配梁上部和下部并对吨袋进行整体布置。另外,对立杆强度、地基承载力和边坡稳定进行了验算,验证整个支撑系统的安全性、可靠性。通过对午河渡槽支撑系统近1个月的预压和观测,测得相关沉降数据,计算出支撑系统的预拱值,实践说明此种预压方式和强度验算是正确的、可行的,为大型渡槽槽身预压又提供了一种方式和思路。
大型渡槽槽身設計撓度要求較高,要求對其支撐繫統進行預壓,測齣排架、地基沉降變形,為支撐繫統施工設置預拱值提供依據。因渡槽自身荷載大,而且支撐繫統預壓最大加載是其自身荷載的1.2倍,為保障施工安全和進度,採用半跨和分配樑承重結構預壓方式。首先計算齣半跨槽身整體荷載(活荷載和恆荷載),然後根據分配樑承重結構形式和三級預壓方式,將荷載分解到分配樑上部和下部併對噸袋進行整體佈置。另外,對立桿彊度、地基承載力和邊坡穩定進行瞭驗算,驗證整箇支撐繫統的安全性、可靠性。通過對午河渡槽支撐繫統近1箇月的預壓和觀測,測得相關沉降數據,計算齣支撐繫統的預拱值,實踐說明此種預壓方式和彊度驗算是正確的、可行的,為大型渡槽槽身預壓又提供瞭一種方式和思路。
대형도조조신설계뇨도요구교고,요구대기지탱계통진행예압,측출배가、지기침강변형,위지탱계통시공설치예공치제공의거。인도조자신하재대,이차지탱계통예압최대가재시기자신하재적1.2배,위보장시공안전화진도,채용반과화분배량승중결구예압방식。수선계산출반과조신정체하재(활하재화항하재),연후근거분배량승중결구형식화삼급예압방식,장하재분해도분배량상부화하부병대둔대진행정체포치。령외,대립간강도、지기승재력화변파은정진행료험산,험증정개지탱계통적안전성、가고성。통과대오하도조지탱계통근1개월적예압화관측,측득상관침강수거,계산출지탱계통적예공치,실천설명차충예압방식화강도험산시정학적、가행적,위대형도조조신예압우제공료일충방식화사로。
It requires high deflection of design for the large aqueduct and the supporting system should be pre-compressed. The deformation of subsidenceofshelvingandfoundationshouldbemeasured.Thesearebasisforthesetofpre-archvalueofthesupportingsystem.Withlargeload oftheaqueduct,themaximumloadofthesupportingsystemis1.2timesasmuchastheloadofitself.Ensuredconstructionsafetyandschedule, thehalf-spanpre-compactionandtheloadbearingstructureschemeofdistributionbeamisadopted.First,thehalf-spanload(liveanddeadloads) is calculated.Then according to distribution beam bearing structure and three-level scheme, the load is assigned to distribution beam up and down.On the basis of distributed load the ton bags are set by the way of equivalent pre-compaction and the cushions, stands, and foundations are checked. And then the security and reliability of the whole supporting system is checked. By means of pre-compaction and observation on Wu aq-ueduct supporting system about 1-month,the severalconcerning subsidence data are obtained,and the pre-arch values of thesupporting system areobtainedasthebasisofsupport systemconstruction.Theexperienceshowsthat pre-compactionschemeandstrengthcheckingisastrategy andanoption.Thatanotheraspectofschemeandthoughtsistakenforthepre-compactionoflargeaqueductbody.