江西水利科技
江西水利科技
강서수리과기
JIANGXI HYDRAULIC SCIENCE & TECHNOLOGY
2013年
4期
265-266,279
,共3页
高层建筑%施工期%抗浮设防水位%工程安全%经济合理
高層建築%施工期%抗浮設防水位%工程安全%經濟閤理
고층건축%시공기%항부설방수위%공정안전%경제합리
High-rise building%Construction period%Anti-floating waterlevel%Project safety%Reasonable
根据建筑物和地形特点,通过岩土工程勘察、水文地质勘察,分析论证了江西省赣州市某F栋高层建筑地下车库施工期的抗浮设防水位,确保在现有抗浮设防水位下工程安全、经济合理。
根據建築物和地形特點,通過巖土工程勘察、水文地質勘察,分析論證瞭江西省贛州市某F棟高層建築地下車庫施工期的抗浮設防水位,確保在現有抗浮設防水位下工程安全、經濟閤理。
근거건축물화지형특점,통과암토공정감찰、수문지질감찰,분석론증료강서성공주시모F동고층건축지하차고시공기적항부설방수위,학보재현유항부설방수위하공정안전、경제합리。
Based on the characteristics of building and geomorphy and by geotechnical engineering investigation and hydrogeologi-cal investigation, the anti-floating waterlevel in the construction period of underground garage of a certain high-rise building in Ganzhou city of Jiangxi province is analyzed and demonstrated in order to ensure the project safe and reasonable in the present an-ti-floating waterlevel.