隧道建设
隧道建設
수도건설
TUNNEL CONSTRUCTION
2014年
4期
303-310
,共8页
莞惠城际轨道%深基坑%邻近建筑物%施工加固%监控量测%有限元软件MIDAS-GTS
莞惠城際軌道%深基坑%鄰近建築物%施工加固%鑑控量測%有限元軟件MIDAS-GTS
완혜성제궤도%심기갱%린근건축물%시공가고%감공량측%유한원연건MIDAS-GTS
Dongguan-Huizhou inter-city rail transit project%deep foundation pit%adjacent building%construction%rein-forcement%monitoring%finite element software MIDAS-GTS
在城际轨道建设中,将深基坑周边邻近建筑物影响降到最低,是设计及施工必须研究的课题。为了解决深基坑开挖过程中邻近建筑物的安全问题,结合莞惠城际轨道GZH-5标工程实例,采用有限元模拟分析方法及该工程大量监测数据,通过建筑物加固前后变形情况对比,深入地研究超深基坑开挖对其邻近建筑物的影响及控制。主要得出以下结论:1)与基坑的距离关系,是影响开挖期间建筑物变形规律的主要因素;2)模型能有效预测莞惠城际GZH-5标施工过程中10层居民楼变形终值超过控制值,可为制定加固措施提供参考;3)该施工加固方案能有效控制10层建筑物的变形与沉降,合理可行。
在城際軌道建設中,將深基坑週邊鄰近建築物影響降到最低,是設計及施工必鬚研究的課題。為瞭解決深基坑開挖過程中鄰近建築物的安全問題,結閤莞惠城際軌道GZH-5標工程實例,採用有限元模擬分析方法及該工程大量鑑測數據,通過建築物加固前後變形情況對比,深入地研究超深基坑開挖對其鄰近建築物的影響及控製。主要得齣以下結論:1)與基坑的距離關繫,是影響開挖期間建築物變形規律的主要因素;2)模型能有效預測莞惠城際GZH-5標施工過程中10層居民樓變形終值超過控製值,可為製定加固措施提供參攷;3)該施工加固方案能有效控製10層建築物的變形與沉降,閤理可行。
재성제궤도건설중,장심기갱주변린근건축물영향강도최저,시설계급시공필수연구적과제。위료해결심기갱개알과정중린근건축물적안전문제,결합완혜성제궤도GZH-5표공정실례,채용유한원모의분석방법급해공정대량감측수거,통과건축물가고전후변형정황대비,심입지연구초심기갱개알대기린근건축물적영향급공제。주요득출이하결론:1)여기갱적거리관계,시영향개알기간건축물변형규률적주요인소;2)모형능유효예측완혜성제GZH-5표시공과정중10층거민루변형종치초과공제치,가위제정가고조시제공삼고;3)해시공가고방안능유효공제10층건축물적변형여침강,합리가행。
During the construction of inter-city rail transit projects,the influence of the construction of deep foundation pits on the adjacent buildings has to be minimized.In this article,the influence of the construction of the deep founda-tion pit of GZH-5 bid section of Dongguan-Huizhou inter-city rail transit project on the adjacent buildings and its control technologies are studied,and comparison and contrast is made between the displacement of adjacent buildings before grouting reinforcement and that after grouting reinforcement,and between the finite element analysis result and the moni-toring result.Conclusions drawn are as follows:1 )The distance between the foundation pit and the adjacent buildings is the main factor that influences the displacement of the adjacent buildings;2 )The finite element calculation model can effectively predict the displacement of the adjacent buildings during the construction of the foundation pit and thus the prediction result can provide reference for the determination of the building reinforcement measures;3 )The grouting re-inforcement measures taken are reasonable and feasible for the control of the displacement of adjacent buildings.