城市勘测
城市勘測
성시감측
URBAN GEOTECHNICAL INVESTIGATION & SURVEYING
2012年
6期
117-120
,共4页
全站仪%实时%动态测量%可视化%系统开发
全站儀%實時%動態測量%可視化%繫統開髮
전참의%실시%동태측량%가시화%계통개발
Entire station%Actual time%Dynamic measurement%Visual Systematization develop
以非开挖管道工程施工测量控制为例,介绍了全站仪、便携式电脑、数据处理及可视化软件的结合而组成的施工测量控制系统。主要阐述了动态数据传输、数据处理、可视化系统开发的过程及方法。
以非開挖管道工程施工測量控製為例,介紹瞭全站儀、便攜式電腦、數據處理及可視化軟件的結閤而組成的施工測量控製繫統。主要闡述瞭動態數據傳輸、數據處理、可視化繫統開髮的過程及方法。
이비개알관도공정시공측량공제위례,개소료전참의、편휴식전뇌、수거처리급가시화연건적결합이조성적시공측량공제계통。주요천술료동태수거전수、수거처리、가시화계통개발적과정급방법。
This article take must excavates the plumbing engineering construction survey control as an example, in- troduced the entire station meter, the portable computer, the data processing and the visualization software union composes construction control system of survey. Mainly elaborated dynamic programming and so on data transmission,data process- ing, visualization system processes and the method. Is for the purpose of providing some references for this control system of survey combination in other project construction survey control application.