中国海洋工程(英文版)
中國海洋工程(英文版)
중국해양공정(영문판)
CHINA OCEAN ENGINEERING
2014年
3期
380-390
,共11页
王国栋%陈国明%许亮斌%殷志明
王國棟%陳國明%許亮斌%慇誌明
왕국동%진국명%허량빈%은지명
riserless mud recovery drilling%lumped mass method%mud recovery line%axial vibration analysis
The series connection of multistage pumping module is the common concept of deepwater riserless mud recovery drilling system. In this system, the influence of the mass of pumping module on the vibration of mud recovery line cannot be ignored, and the lumped mass method has been utilized to discretize the mud recovery line. Based on the analysis of different boundary conditions, the paper establishes the axial forced vibration model of the mud recovery line considering the seawater damping, and the vibration model analysis provides the universal solution to the vibration model. An example of the two-stage pumping system has been used to analyze the dynamic response of mud recovery line under different excited frequencies. This paper has the important directive significance for the application of riserless mud recovery drilling technology in deepwater surface drilling.