工厂%预制化%管道%技术
工廠%預製化%管道%技術
공엄%예제화%관도%기술
factory%prefabricated%pipeline%technology
随着工业建设规模的不断扩大,管道工程工艺要求越来越复杂,质量要求越来越高,在具备管道施工条件时,留给管道安装的工期短,任务重,管道工厂化预制将有效地提高功效和工程质量,是管道安装工程的发展方向。本工程管道施工采用工厂化预制技术。
隨著工業建設規模的不斷擴大,管道工程工藝要求越來越複雜,質量要求越來越高,在具備管道施工條件時,留給管道安裝的工期短,任務重,管道工廠化預製將有效地提高功效和工程質量,是管道安裝工程的髮展方嚮。本工程管道施工採用工廠化預製技術。
수착공업건설규모적불단확대,관도공정공예요구월래월복잡,질량요구월래월고,재구비관도시공조건시,류급관도안장적공기단,임무중,관도공엄화예제장유효지제고공효화공정질량,시관도안장공정적발전방향。본공정관도시공채용공엄화예제기술。
As the industrial construction scale extends, pipeline engineering technical requirements become more and more complex, and quality requirements become higher. When there are pipeline construction conditions, the time left for pipe installation is very short, but the task is heavy. Pipeline factory prefabrication will effectively improve the efficacy and the engineering quality, so it is the development direction of pipeline installation. The pipeline construction in this project adopts the factory prefabrication techniques.