郑彬%印永华%班连庚%张健%张振宇%周佩朋%罗煦之%牛拴保%何凤军%杨大业%王康平%杨超
鄭彬%印永華%班連庚%張健%張振宇%週珮朋%囉煦之%牛拴保%何鳳軍%楊大業%王康平%楊超
정빈%인영화%반련경%장건%장진우%주패붕%라후지%우전보%하봉군%양대업%왕강평%양초
新疆与西北联网%第二通道%灵活交流输电%系统调试%现场实施
新疆與西北聯網%第二通道%靈活交流輸電%繫統調試%現場實施
신강여서북련망%제이통도%령활교류수전%계통조시%현장실시
interconnecting Xinjiang Grid with Northwest China main grid%second transmission channel%FACTS%system commissioning%on-site implementation
新疆与西北主网联网750 kV第二通道工程是国家电网公司“十二五”规划重点建设项目之一,涉及7站12线,是我国西北750 kV主网架的重要组成部分,也是新疆及西北地区煤电、风电及光伏的重要外送通道。工程在世界上形成首个由750 kV级母线磁控式可控高抗、线路阀控式可控高抗及66 kV级大容量SVC等新型柔性交流输电装置组成的FACTS设备群。工程系统调试研究解决了远距离弱电网新设备启动及电压控制策略、柴拉直流及新能源安全预控、新型FACTS设备系统调试及多目标网架安控策略等技术难题,圆满完成系统调试实施。该文介绍了工程系统调试概况,系统调试研究及调试方案的确定,以及现场调试的主要结果,为工程投产运行及后续工程建设提供参考。
新疆與西北主網聯網750 kV第二通道工程是國傢電網公司“十二五”規劃重點建設項目之一,涉及7站12線,是我國西北750 kV主網架的重要組成部分,也是新疆及西北地區煤電、風電及光伏的重要外送通道。工程在世界上形成首箇由750 kV級母線磁控式可控高抗、線路閥控式可控高抗及66 kV級大容量SVC等新型柔性交流輸電裝置組成的FACTS設備群。工程繫統調試研究解決瞭遠距離弱電網新設備啟動及電壓控製策略、柴拉直流及新能源安全預控、新型FACTS設備繫統調試及多目標網架安控策略等技術難題,圓滿完成繫統調試實施。該文介紹瞭工程繫統調試概況,繫統調試研究及調試方案的確定,以及現場調試的主要結果,為工程投產運行及後續工程建設提供參攷。
신강여서북주망련망750 kV제이통도공정시국가전망공사“십이오”규화중점건설항목지일,섭급7참12선,시아국서북750 kV주망가적중요조성부분,야시신강급서북지구매전、풍전급광복적중요외송통도。공정재세계상형성수개유750 kV급모선자공식가공고항、선로벌공식가공고항급66 kV급대용량SVC등신형유성교류수전장치조성적FACTS설비군。공정계통조시연구해결료원거리약전망신설비계동급전압공제책략、시랍직류급신능원안전예공、신형FACTS설비계통조시급다목표망가안공책략등기술난제,원만완성계통조시실시。해문개소료공정계통조시개황,계통조시연구급조시방안적학정,이급현장조시적주요결과,위공정투산운행급후속공정건설제공삼고。
ABSTRACT:The second 750 kV transmission channel project interconnecting Xinjiang Grid with northwest China main grid is one of the key construction projects of State Grid Corporation of China during China’s 12th Five Year Plan. This project, which relates to seven 750 kV substations and twelve 750 kV transmission lines, is an important constituent of 750 kV main network frame of Northwest China power grid and is also an important outward transmission channel of power generated by thermal plants, wind farms and photovoltaic generation stations located in Xinjiang and Northwest China. Through the implementation of this project, a new type of power electronic equipment group for flexible AC transmissions system (FACTS) composed of 750 kV bus-type magnetic-controlled shunt reactor, 750 kV line-type thyristor-controlled shut reactor, 66 kV high-capacity SVC and so on is formed and is the first FACTS equipment group in the world. The research on the system commissioning for this project solves such technical difficulties as the starting-up and voltage control strategy of new equipment located in long-distance weak power grid, the security pre-control of DC transmission system from Qaidam to Lhasa and new energy resources, systematic commissioning of new-type of FACTS equipment and multi-objective security control strategy for grid frame and so on, thus the system commissioning and implementation can be successfully completed. In this paper, the general situation of system commissioning for this project, the research on the system commissioning and the determination of commissioning scheme, main results of on-site commissioning are presented, and these contents are available for reference to putting this project into operation and for the construction of follow-up projects.