核安全
覈安全
핵안전
NUCLEAR SAFETY
2012年
3期
60-65
,共6页
姜萍萍%常猛%宋祖荣%吴晓燕
薑萍萍%常猛%宋祖榮%吳曉燕
강평평%상맹%송조영%오효연
设计接口%接口控制手册(ICM)%信息化
設計接口%接口控製手冊(ICM)%信息化
설계접구%접구공제수책(ICM)%신식화
design interface%Interface Control Manual (ICM)%informatization
介绍了如何利用接口控制手册(ICM)对设计接口进行优化管理,分析了在多项目总承包情况下设计接口存在的风险,并针对这类风险提出了合理的应对措施。
介紹瞭如何利用接口控製手冊(ICM)對設計接口進行優化管理,分析瞭在多項目總承包情況下設計接口存在的風險,併針對這類風險提齣瞭閤理的應對措施。
개소료여하이용접구공제수책(ICM)대설계접구진행우화관리,분석료재다항목총승포정황하설계접구존재적풍험,병침대저류풍험제출료합리적응대조시。
In this thesis, the method how to utilize the ICM to optimize the design interface manage- ment is introduced. Moreover, the potential risks of the design interface management under the condition with multi-project general contracting are analyzed. Subsequently, to evade the very risks, the reasonable measures are proposed as well.