本文介绍了滨海输变电线路铁塔的防腐防护工作,提出除采取必要的热浸镀锌手段外,还要大力提高金属表面除锈技术及工艺,完善残留锈蚀问题。通过多种防护方案的优化,最大程度的发挥保护效能,减缓输变电铁塔的腐蚀损伤。
本文介紹瞭濱海輸變電線路鐵塔的防腐防護工作,提齣除採取必要的熱浸鍍鋅手段外,還要大力提高金屬錶麵除鏽技術及工藝,完善殘留鏽蝕問題。通過多種防護方案的優化,最大程度的髮揮保護效能,減緩輸變電鐵塔的腐蝕損傷。
본문개소료빈해수변전선로철탑적방부방호공작,제출제채취필요적열침도자수단외,환요대력제고금속표면제수기술급공예,완선잔류수식문제。통과다충방호방안적우화,최대정도적발휘보호효능,감완수변전철탑적부식손상。
Transmission line tower by the sea were introduced in this paper the corrosion protection work, put forward in addition to the necessary means of hot dip galvanized, but also improve the metal surface cleaning technology and process, perfect the residual rust problem. through a variety of protective scheme optimization, maximizes the protection efficiency of slow transmission tower corrosion damage.